  Projects > Microtunneling
Name: Delta Power Plant Intake/Discharge
Owner: Delta Power
General Contractor: CH Schwertner Construction
Microtunneling Sub Contractor: Bradshaw Construction
Pipe Size : 930' of 59" OD x 1.625" wall & 525' of 59" OD x .750 wall
 

The Problem:

To install a steel casing through rock and liquified silt into the Susquehanna River to facilitate construction of intake and discharge cooling water lines for a new 545 mega watt power plant.

 

The Solution:

Since over 900' of the casing would be installed in soft liquified silt, it was necessary for Permalok to design a casing heavy enough to overcome the uplift forces.  This was accomplished by using 1.625" thick pipe and installing cast iron counterweights in the pipe invent.  The .750" wall pipe was in solid rock where uplift was not an issue.